One system from the tenderto the production line.

VLUERP runs the whole contract and the whole factory on one ledger. A project that draws material straight from a production order — and bills it back on the same certificate.

20contracting modules
24industry modules
1ledger
CONTRACTING FACTORY Tender Programme Production order BOM & work centre Delivery Certificate CONTRACTING FACTORY Tender Production Certificate
SteelFood ConcreteLeather PrintingBoats PharmaSee all 24
NEW · BOTTLED WATER

From the well to the customer's door, in one system

Treatment line and quality lab, production in every bottle size, returnable 5-gallon jugs with deposits, and van sales settled every evening — on the same ledger as the accounts and the stores.

  • Limits register seeded from GSO 1025 and SFDA
  • Batches held until the lab releases them
  • Net content checked by OIML R87 sampling
  • Jug balance and deposit for every customer
  • Van load, sale, returns and cash in one trip
  • ISO 22000 and ISO/IEC 17025 in the audit module
7 pages · also in العربية · every industry has one on its page
VLUERP for bottled-water plants — brochure cover

This is the actual software

Not mock-ups. Four screens from a running system, with the numbers it worked out itself. Click any of them to enlarge.

/dashboard/
Click to zoom Budget against actual, every job
Budget against actual, every jobSix live projects. The pale bar is what was budgeted, the solid one what the ledger has actually absorbed — so an overrun shows up as a shape, not a number you have to hunt for.
/erp/project-budget/
Click to zoom How much of the budget is gone
How much of the budget is goneCoastal Villas has used 97% of its budget and the bar turns amber. Total 24,367,313 spent of 34,602,000 — 70% used across the book.
/erp/portfolio/
Click to zoom Six jobs, one page
Six jobs, one pageCommitted from approved POs and subcontracts, actual from the GL cost ledger, earned from the programme. CPI 0.88 on the silo job is red because it is losing money — the screen says so rather than averaging it away.
/erp/leather/skins/
Click to zoom A hide, drawn to its real outline
A hide, drawn to its real outline76 pattern pieces nested on one skin. 72.1% of it may legally be cut into a shoe upper; the rest is neck and shank, bought and unusable.

Two products would need two ledgers. This is one.

Pick the half you are here for — they are the same system, and a company that does both never reconciles anything twice.

20 core modules

Contracting

Priced from the BOQ, built against the programme, billed on certificates, and closed with a final account that reconciles to the general ledger.

Tenders & BOQProjects SubcontractsCost control Banking · BG & LC Risk & conformity
24 industry modules

Industries

A separate module for each trade with the real engineering inside it — nesting, blending, stability, make-ready, traceability. Switch on only yours.

SteelFood PlasticsLeather PrintingBoats +18 more
MASTER BROCHURE

VLUERP for contractors — the complete guide

Nineteen pages that walk through every part of the system: tenders and BOQ, CRM and contracts, projects and planning, cost control, purchasing, subcontracts, certificates and billing, cash and bank guarantees, accounting, equipment, risk and conformity — with worked figures from testing.

19 pages each · about 0.9 MB
Brochure cover

Book a demo

Tell us what you run. We set up the modules you need with your own products, prices or bill of quantities, and walk you through them — no generic slideshow.

  • A reply within one working day
  • A session on your own data, online or at your office
  • A seven-day trial of any module afterwards

Prefer email? [email protected]